
Project Overview
Name: | 320t/h construction waste material crushing |
Material: | construction waste material |
Capacity: | 320t/h |
Location: | Zhejiang, China |
Equipment: | mobile jaw crusher, mobile cone crusher, mobile screening machine |
Working Process
First, the construction waste is screened, iron-removed, and classified, and then crushed by the mobile jaw crusher. Next, the crushed raw materials are passed into the vibrating screen for screening, and the finished product that meets the particle size specifications is output to the next process. The finished product does not meet specification returns to the upper layer to continue crushing. Finally, all the material that meets the specification enters the cone crusher to be finely crushed again. The finished product after the fine crushing can be output.
Advantages of the project
- High production efficiency
Multi-machine combined operation, high production efficiency, good stability, and uniform output granularity of finished products.
- Lower maintenance cost
Excellent operating performance, reliable equipment quality, low maintenance cost.
- Easy to move
It is flexible and convenient to move, can be processed and produced on-site, and has a small floor space.
- Stable operation
The quality of the equipment is excellent, the running time is long, and the service life is long.
Words From Customer

The construction waste crushing station is mobile and has a strong processing capacity. Its work effect has been recognized by relevant personnel. The production efficiency has exceeded the expected target. In the later period, we will plan to expand our business and choose to continue to cooperate with AGICO.